top of page
![](https://static.wixstatic.com/media/nsplsh_52344253476d304a377951~mv2_d_5345_3648_s_4_2.jpg/v1/fill/w_1920,h_1310,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/nsplsh_52344253476d304a377951~mv2_d_5345_3648_s_4_2.jpg)
مضخات الخرسانة
Links repairs
Links repairs
repairs are done via welding according to PQR and WPS using specially imported welding electrodes with high tensile strength and high elongation coefficient for this exact application.
the panel replacement philosophy we follow is fitted to this application to ensure the highest safety margins
![]() Before | ![]() After |
---|
![]() Before | ![]() After |
---|
![]() Before | ![]() After |
---|
Cracks supporting
Cracks supporting
In some cracks cases, welding the crack only is not enough of a solution, supporting takes place at this point as seen in pictures below:
![]() Before | ![]() Through | ![]() After |
---|
This video shows the supporting philosophy for this application, the changed plate has been supported by 3 back plates and 10 plug welds for increased tensile strength.
Also the cut on the side has been created to relief welding stresses and has been welded shut after the completing the welding process
![](https://static.wixstatic.com/media/23d870_8a9cf746fdcf4015b21016bbfd5c831cf002.jpg/v1/fill/w_340,h_272,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/23d870_8a9cf746fdcf4015b21016bbfd5c831cf002.jpg)
![]() Before | ![]() After |
---|
Cracks fil welding
Cracks Fill welding
![]() Crack fill welding i | ![]() Crack fill welding ii | ![]() Crack fill welding iii |
---|---|---|
![]() Crack fill welding iv | ![]() Crack fill welding v |
Anchors repairs
Anchoring piers repairs
![]() Before | ![]() After |
---|
this Schwing pump had extreme deterioration and rust at the plates seen in the photos, weakening the structure of the whole pump, an urgent panel replacement process took place, the geometry of welding was as seen in the video
![](https://static.wixstatic.com/media/23d870_c1e042e08ca74aacb1e2d204e8dccad7f000.jpg/v1/fill/w_438,h_134,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/23d870_c1e042e08ca74aacb1e2d204e8dccad7f000.jpg)
![]() Fabrication and installation of an anchoring pillar i | ![]() Fabrication and installation of an anchoring pillar ii | ![]() Fabrication and installation of an anchoring pillar iii |
---|
Swivel join repairs
Swivel joint repairs
![]() Through i | ![]() Through ii | ![]() After |
---|
Pins and bushings fabrication
Bushings & pins fabrication
![]() Before | ![]() After | ![]() Bushings installation |
---|---|---|
![]() Bushings welding |
Centricty adjustmets
Centricity adjustments
![]() Adjusting centricity of a manufactured bushing before welding i | ![]() Adjusting centricity of a manufactured bushing before welding ii |
---|
Clearnce adjustmets
Clearence adjustments
![]() |
---|
Carriers repairs
Carriers repairs
![]() Carrier repair i | ![]() Carrier repair ii |
---|
Hober hardfacng
Eccentric hober hard facing
![]() | ![]() |
---|
Boring
Boring
![]() Link center boring i | ![]() Link center boring ii |
---|
Hydraulics repairs
Hydraulic pistons & cylinders electroplating buildup and grinding
![]() |
---|
serviced pumps
Some of the pumps we serviced
![]() | ![]() | ![]() |
---|---|---|
![]() |
bottom of page